Planning of Fibre to the Curb Using G. Fast in Multiple Roll-Out Scenarios
2013-12-10 14:54:50   来源:   评论:0 点击:

Abstract—In this paper we present a simple framework for planning options when deploying Fibre to the Curb, using G. Fast as technology. We present a framework of eight possible planning options, roll-out scenarios, coming from three main planning choices. We elaborate the mathematical approach of each of these eight options, using combinations of existing methods. We also show the results of a real life case, rolling out Fibre to the Curb in Amsterdam and The Hague, resulting in an example of the calculation time needed and the indication of the costs of such a roll-out.

Index Terms—G. fast, fibre to the curb, access network planning, telecommunications

Cite: Frank Phillipson, "Planning of Fibre to the Curb Using G. Fast in Multiple Roll-Out Scenarios," Lecture Notes on Information Theory, Vol. 2, No. 1, pp. 42-49, March 2014. doi: 10.12720/lnit.2.1.42-49
Array

相关热词搜索:

上一篇:The Audit of Organizational Knowledge
下一篇:Thinking on the Equipment Acquisition Process Reengineering

分享到: 收藏
评论排行