Planning of Fibre to the Curb Using G. Fast in Multiple Roll-Out Scenarios
2013-12-10 14:54:50 来源: 评论:0 点击:
Abstract—In this paper we present a simple framework for planning options when deploying Fibre to the Curb, using G. Fast as technology. We present a framework of eight possible planning options, roll-out scenarios, coming from three main planning choices. We elaborate the mathematical approach of each of these eight options, using combinations of existing methods. We also show the results of a real life case, rolling out Fibre to the Curb in Amsterdam and The Hague, resulting in an example of the calculation time needed and the indication of the costs of such a roll-out.
Index Terms—G. fast, fibre to the curb, access network planning, telecommunications
Cite: Frank Phillipson, "Planning of Fibre to the Curb Using G. Fast in Multiple Roll-Out Scenarios," Lecture Notes on Information Theory, Vol. 2, No. 1, pp. 42-49, March 2014. doi: 10.12720/lnit.2.1.42-49
Index Terms—G. fast, fibre to the curb, access network planning, telecommunications
Cite: Frank Phillipson, "Planning of Fibre to the Curb Using G. Fast in Multiple Roll-Out Scenarios," Lecture Notes on Information Theory, Vol. 2, No. 1, pp. 42-49, March 2014. doi: 10.12720/lnit.2.1.42-49
Array
相关热词搜索:
上一篇:The Audit of Organizational Knowledge
下一篇:Thinking on the Equipment Acquisition Process Reengineering
分享到:
收藏

评论排行
频道总排行
频道本月排行
- 3An Evolutionary Evaluation of ...
- 2A Cost Effective Topology Migration Path Towards Fibre
- 2The Strategic Requirements for...
- 2Planning of Fibre to the Curb...
- 2Key-Amplified Cipher
- 1An Energy Aware Ladder Diffusi...
- 1Cloud-Assisted Real-Time Spectru...
- 1A Solution for Multipurpose Lo...
- 1The Audit of Organizational Knowledge
- 1Thinking on the Equipment Acqu...